The outside of the building takes the weather, and it is where small problems turn into expensive ones. We handle roofing and gutters, siding and trim, windows and doors, decks, patios and porches, so one contractor owns the whole envelope instead of three pointing at each other.

What exterior work covers
Roofing and gutters, siding and trim, windows and doors, decks, patios and porches, and the grading and drainage that keeps water away from the building. We install GAF and CertainTeed roofing and siding, and Andersen and Pella windows and doors.
Most houses around Glenside were built before 1978, so exterior work disturbs painted surfaces and lead-safe practice applies. JDB is an EPA Lead-Safe Certified Firm.
Signs it has stopped being safe to wait
- Shingles curling or lifting, or granules collecting in the gutters
- Water staining on an upstairs ceiling, however small
- Gutters overflowing at the same corner after every storm
- Siding cracked, warped or pulled away from the wall
- Drafts or condensation between window panes
- Soft timber in sills, trim or deck boards
Doing it in the right order
If several things need doing, the order matters. Roof before siding, siding before windows where they meet, and drainage before anything that sits on the ground. Doing it out of order means paying twice for the same access.
We will tell you what has to happen now and what can safely wait a year, even when that means a smaller job for us this season.
Other outdoor work
Exterior renovation covers the shell of the building. If what you have in mind sits in the garden rather than on the house, these are the pages for it.
JDB Service Group did an excellent job on all of the work performed for us over the years. They were reliable, clean, they came in on time and within budget.
ElizabethHorsham, PACommon questions
Usually for a deck or a structural change, often not for a like-for-like roof or siding replacement. Permits come from your township, and Glenside sits across two of them, so it depends on your address. We check it and handle the paperwork.
Often yes, and we will say so. A roof with years left and one bad valley needs the valley fixed, not a new roof. Where the material is near the end of its life we will tell you that a patch is money spent twice.
Book in winter to build in spring. Exterior work concentrates into a short season here and the spring slots go early. Fall is a good time to build and far easier to schedule.
Yes. Roofing, siding, windows and entrances on commercial properties are regular work, and we are used to keeping a building open and operating while we do it.
We will tell you what needs doing now and what can wait.

